Posts: 2833 from 2003/2/8
From: USA
Ladies and Gentlemen,
Next month sometime, MorphZone will be getting a major face-lift. Expect about a day with no service, and maybe about a week with reduced functionality. After the period is over, we expect to have an improved interface and more functionality in place.
Expected Features:
- Less Clutter
- Download Area will accept uploads
- Possible picture uploads in the forums
- A Recent Page (instead of all the blocks on the front page)
- TopList Page (listing top downloads, links, etc)
The expected changeover date is between 15-July and 28-July